Connect with us

JAMMU & KASHMIR

Damaged in 2017, authorities fail to repair only connectivity, residents suffer | KNO

Published

on

kno news

Baramulla, April 20 (KNO) : Residents of Naganari, Boniyar area of district Baramulla here have expressed resentment authorities for failing to reconstruct the only connecting pathway in the area, which was damaged two years ago. Constructed and damaged by the flood in the year 2017, the only bridge that connects the area with rest of the areas including Primary Health Center, Post Office and several private schools and government higher secondary School is in shambles. The residents told KNO they are forced to walk through the damaged bridge since it is risky for them especially for women and school going children. “The bridge was damaged years back after couple of months it was constructed, since then we risk our lives while Walk through since the water level from the channel remains high throughout the year,” Ishfaq Ahmad, of the residents and village head (Sarpanch) told KNO. Ahmad said that the bridge was constructed by I&FC department, however was damaged by the flood in the water channel. The residents allege that the authorities put them and lives of hundreds of children in danger by not constructing the bridge from the only way in the area.They told KNO that they have many a times appealed to the concerned authorities regarding their misery and problems they face by each passing day but they Administration seem not even nodding their heads. “We have appealed to DC Baramulla by an application nearly a year back but since then no response came through,” they told KNO. One of the students told KNO that they fear risk of death while walking through the damaged bridge, since they have no other way to reach school. “Not only students but inhabitants face everyday this risk of life, in fact couple of times children fell from other side and were injured,” he told KNO Executive Engineer R&B Boniyar Imtiyaz Ahmad told KNO that they have taken up the matter however there is the lack of funds for these works since the Block Development department has to take up these works. “We have put their bridge construction in the district sector and hopefully the needful would be done accordingly,” he told KNO. Despite several attempts, DC Baramulla could not be reached for his comments.(KNO)

Trending

TOP STORIES1 hours ago

Attendant allegedly assaults doctor, leaves him injured at Pulwama Hospital | KNO

TOP STORIES1 hours ago

If need arises armed forces will act even inside Pakistan’s own territory: Amit Shah | KNO

TOP STORIES1 hours ago

IFS induction stalled in J&K for 13 years | KNO

TOP STORIES1 hours ago

India, Cyprus demand global action against cross-border terrorism, condemn Pahalgam terror attack | KNO

TOP STORIES1 hours ago

Valley’s high altitudes receive snowfall; hailstorm batters plains | KNO

TOP STORIES1 hours ago

Dialogue ends deadlock: Centre, Ladakh reach understanding on key issues | KNO

TOP STORIES1 hours ago

Elected govt not involved in Sidhra demolitions: Farooq Abdullah | KNO

TOP STORIES1 hours ago

Fourth hailstorm this season; orchardists say ‘pushed towards collapse’ | KNO

TOP STORIES1 hours ago

Schizophrenia treatable but stigma delays treatment: Psychiatrist | KNO

TOP STORIES1 hours ago

Traffic restrictions in Shopian for mega padtayra today | KNO

TOP STORIES1 hours ago

Boy dies after tractor overturns in Saimoh Tral | KNO

TOP STORIES1 hours ago

ACB registers disproportionate assets case against AEE in Kishtwar | KNO

TOP STORIES1 hours ago

KCCI urges strict collateral-free MSME lending in J&K, seeks bigger industrial package | KNO

TOP STORIES1 hours ago

Northern Railway launches new commercial initiatives to enhance passenger faculities, boost revenue | KNO

TOP STORIES1 hours ago

LG Sinha unveils poster of short film “Ek Galat Kadam” | KNO

TOP STORIES1 hours ago

CM extends greetings on Urs of Mir Sayyid Ali Hamadani (RA) | KNO

TOP STORIES1 hours ago

CS reviews comprehensive traffic decongestion plan for Jammu, Srinagar Cities | KNO

Copyright © 2021